10/16/2007 Our new
addition
arrives and
with the
help of our
friends at
J&B
Mechanical,
all is
offloaded 2
hours later.

The picture
on the left
shows work
progressing
on the
foundation.
The picture
on the right
shows our
existing
hangar, the
addition
will be to
the right
side of this
view.

A new
corporate
hangar
across the
ramp from
us.

No work
today.
Several
tornados
strike the
surrounding
area from a
series of
storms
through out
the evening
of Oct.
18th, 2007.
No damage at
the airport.

Footers and
Piers
completed
10/27/2007

Plumbing in
and awaiting
inspection
10-29-2007.
The plumbing
passed the
following
day. Thanks
to Scott
Shelton and
his crew
from
Shelton's
Plumbing.



11-01-2007
Work began
before sunup
getting
ready for
the
concrete. We
told the
fellow on
the
troweling
machine,
with the
proper mods
to the
engine, and
airfoils in
place of the
troweling
blades, we
may get that
thing to
fly. Thanks
to Ricky
Sloan and
all the guys
on the
concrete
crew.


11-03-2007
The steel
begins to go
up. J&B
Mechanical
brought out
the boom
truck to
help again.

11/19/2007
We are under
roof! Work
continued
today
installing
insulation
and liner
panel for
the roof and
added area
outside the
building.


11/27/2007
The liner
panel for
the ceiling
is complete
and looks
great.
Framing for
the interior
walls
begins.
03/25/2008
It's been a
while since
our last
update. The
walls,
electrical,
and HVAC are
all in
place. A big
thanks to
McConnell
Electric,
Woodard
Cooling and
Heating
and
our own in
house
painting
crew. Today,
the crew
from
Industrial
Floors and
Coatings
got started
applying the
finish to
the floor.



|